ZTE Corporation ZXMBW-RA25 Benutzerhandbuch

Seite von 99
 
 
Chapter 6 Main Antenna Feeder System Installation 
 
Confidential and Proprietary Information of ZTE CORPORATION      55 
Main Feeder Connector Making  
Caution:
 
Making the feeder connectors is the most important procedure 
in the installation of the antenna feeder system, since the quality of 
them directly affects the performance of both the equipment and 
network. Be cautious when using knives and cutters, for they are sharp 
and may cause injury.  
 
This section describes this process by using the ROSENBERGER 
7/8" feeder connector as example. For the details on installing a 
connector of another specification, please refer to the related 
installation manual.  
1.  The common cutting tool to make the feeder connector is as 
shown in Figure 37.  
F
I G U R E  
3 7
 
7 / 8 "
 
F
E E D E R  
C
O N N E C T O R  
C
U T T I N G  
T
O O L
 
 
 
2.  Measure a straight feeder section of about 150 mm to be 
installed with the connector, and cut and strip the feeder 
sheath 50 mm away from the end using a safety cutting tool.  
3.  Put the feeder into the notch of the cutter (EASIAX), leaving 
a length of four sheath threads behind the main blade. And 
then close the cutter handles. Since the position of the cutter 
is determined by the threads on the external copper sheath 
of the feeder, the main blade must just be aligned with the 
crest at the center of a thread of the feeder.  
4.  Turn the cutter in the direction as marked on the cutter until 
the handles are completely closed by the protection cover 
and the cutter cuts the internal and external copper 
conductors of the feeder completely. At the same time, the 
auxiliary blade of the cutter cuts the external plastic 
protection sheath of the feeder, as shown in Figure 38.