ADC Telecommunications Inc. F0694-011 Benutzerhandbuch
Fusion Wideband Installation Procedures
7-28
InterReach Fusion Wideband Installation, Operation, and Reference Manual
CONFIDENTIAL
D-620616-0-20 Rev D
Figure 7-18
Installing Directly to the Wall
NOTE: Leave the dust caps on the fiber ports until you are ready to connect the fiber
optic cables.
optic cables.
Installing an Optional Cable Manager in the Rack
• Using the screws provided, fasten the cable manager to the rack, immediately
above or below the Expansion Hub.
Powering On the Expansion Hub
1.
Connect the AC or DC power as explained in “Making Power Connections” on
page 7-18.
page 7-18.