Fusion Wideband Installation Procedures
• Verify that only captive centerpin 75 Ohm Type-F connectors are used on the solid 
copper center conductor CATV 75 Ohm cable.
• Verify that the CATV cable is labeled with:
• Fusion Wideband Main Hub port number being used
• RAU identifier
• Carrier (for multiple operator systems)
To connect the CATV cable:
1.
Connect the CATV cables to the F female port on the RAU according to the label 
on the cable.
Power is supplied by the Fusion Wideband Main Hub over the CATV cable con-
ductors. Upon power up, the LEDs will blink for two seconds as a visual check 
that they are functioning. After the two-second test:
• The 
LINK
 LED should be green indicating it is receiving power and communi-
cations from the Fusion Wideband Main Hub.
• The 
ALARM
 LED should be red until the Fusion Wideband Main Hub issues the 
band command, within about 20 seconds, then it should be green.
2.
Record which cable you are connecting to the RAU (from the label on the cable).
This information is required for the As-Built Document.
3.
Tie-off cables or use the optional cable manager to avoid damaging the connectors 
because of cable strain.
7.4.3.1
Troubleshooting Using RAU LEDs During Installation
• The 
LINK
 LED should be green and remain green for longer than 90 seconds. The 
ALARM 
LEDs are red when the system band has not been programmed.