Measurement Systems International Inc DL7200RFH Benutzerhandbuch
M E A S U R E M E N T S Y S T E M S I N T E R N A T I O N A L
MSI-7200 Dyna-Link
•
User Guide Page 5
INSTALLATION
The Dyna-Link can be installed into a variety of applications. Its primary appli-
cation is measuring tension in load monitoring and certification applications.
cation is measuring tension in load monitoring and certification applications.
WARNING: Due to the lack of any swivel fittings, it is important that all
torque loads are kept to a minimum. The use of properly rated fittings is
imperative for safety and performance. The MSI-7200 Dyna-Link models are
sized for industry-standard shackles.
torque loads are kept to a minimum. The use of properly rated fittings is
imperative for safety and performance. The MSI-7200 Dyna-Link models are
sized for industry-standard shackles.
BATTERIES
A low battery lamp will appear when the expected life is approximately 60
hours. At approximately 10 hours remaining, the lamp will start to blink. If the
power is too low, the unit will automatically power down.
hours. At approximately 10 hours remaining, the lamp will start to blink. If the
power is too low, the unit will automatically power down.
To Remove / Replace the Batteries
1) Remove the yellow battery cap in the load cell body.
2) Remove the batteries by tilting the load cell body slightly.
3) Replace the batteries with 2 fresh alkaline “C” cells, positive end first.
4) Replace the battery cap. Ensure that the yellow cap is screwed in all the
2) Remove the batteries by tilting the load cell body slightly.
3) Replace the batteries with 2 fresh alkaline “C” cells, positive end first.
4) Replace the battery cap. Ensure that the yellow cap is screwed in all the
way to maintain sealing.
Note: The O-ring should be lubricated with O-ring lubricant periodically.