Tornado 9SYLTX2-1 Benutzerhandbuch
1N00-511 Genesis 80cm Boat Installation Manual - Export v1.0 08/03
©Tornado International Ltd. 2003
-4-
Confidential
On Delivery
Before Opening Crates
1. Check the number of crates delivered agrees with the number on the
shipping documents.
2. Inspect the crates for damage. If any damage is visible note the crate
number, and the position and extent of the damage. If the crates are not to
be opened immediately, the shipping company should be notified as soon
as possible. If the crates are to be opened at this time, wait until the
product is inspected for damage.
be opened immediately, the shipping company should be notified as soon
as possible. If the crates are to be opened at this time, wait until the
product is inspected for damage.
3. The crates should be moved to a position close to the operating area
before opening.
4. The crates should be opened carefully, the contents removed and the
quantities checked against the shipping notes. A product identification
chart can be found at Appendix A. If any damage was noted on the outside
of the crates, the product next to the damage should be inspected
carefully. Any damage should be notified to the shipping company as soon
as the product is unpacked. Any shortage should be notified to Tornado
International Ltd. in writing (letter, fax or e-mail) as soon as possible and in
any event not later than 5 days after receipt.
chart can be found at Appendix A. If any damage was noted on the outside
of the crates, the product next to the damage should be inspected
carefully. Any damage should be notified to the shipping company as soon
as the product is unpacked. Any shortage should be notified to Tornado
International Ltd. in writing (letter, fax or e-mail) as soon as possible and in
any event not later than 5 days after receipt.