Wavetec FZCO WT-AH Benutzerhandbuch
QC Guide of Active Hub
Jul. 13
16
2. Testing Active Hub on TSU Networks Using IN Port:
After successful testing of Active Hub on Display network, remove the power to the Active Hub and change its DIP
switch position to “TSU” and connect to the network of TSUs as shown in Figures below.
switch position to “TSU” and connect to the network of TSUs as shown in Figures below.
Testing Active Hub on TSU Network
Dip switch setting for TSU Network:
When the TSU is connected with the network scanner PCB and the 12V DC adapter is inserted in the DC JACK of
Network Scanner PCB, TSU will turn ON and the following screen will appear,
Network Scanner PCB, TSU will turn ON and the following screen will appear,
Ver : TSU 06-1-06
Use opposite
configuration as Dip
switch is now bottom
actuated.
configuration as Dip
switch is now bottom
actuated.