Troy-Bilt 2620 Benutzerhandbuch

Seite von 60
Finish securing chute control assembly to chute support 
3. 
bracket with wing nut and hex screw removed earlier.  
See Fig. 3-4.
Check that all cables are properly routed through the cable 
4. 
guide on top of the engine. See Fig. 3-5.
Figure 3-4
Set-Up
Shear Pins
A pair of replacement auger shear pins and bow tie cotter pins 
are included with your snow thrower. Store them in your snow 
thrower’s dash panel until needed. See Fig. 3-6.
Chute Clean-Out Tool
The chute clean-out tool is fastened to the top of the auger 
housing with a mounting clip and a cable tie at the factory. Cut 
the cable tie before operating the snow thrower. See Fig. 3-7.
Figure 3-6
Chute Clean-out Tool
Figure 3-7
Figure 3-5
8
s
ectiOn
 3— a
sseMbly
 & s
et
-u
p