Generac Power Systems 7 kW NG Benutzerhandbuch

Seite von 192
TRANSFER SWITCH
sEctioN 3.4
DiaGNostic tEsts
Part 3
Page 77
13. Set VOM to measure DC voltage.
14. Connect the (-) negative meter test lead to Wire 0 at the 
terminal strip in the generator. Connect the (+) positive 
meter  test  lead  to Wire  23  at  the  terminal  strip  in  the 
generator. 12 VDC should be measured.
15. Place  generator  AUTO-OFF-MANUAL  switch  to  the 
AUTO  position. Turn  off  utility  power  supply  to  the 
transfer  switch,  simulating  a  utility  failure.  After  the 
generator  starts  10  seconds  should  elapse  before 
transfer  occurs.  At  that  time  the VOM  DC  voltage 
should drop to zero. This indicates the PCB energized 
the transfer relay.
a.  If DC voltage drops to zero, refer to Flow Chart.
b.  If DC voltage remains constant at 12 VDC, pro-
ceed to Step 16.
16. With the generator running and utility off, ground Wire 23 
in the control panel at the terminal strip. If transfer relay 
energizes and or transfer occurs, replace the PCB.
17. Set VOM to measure DC voltage.
18. Connect the negative (-) test lead to the ground lug in 
the transfer switch. Connect the positive (+) test lead to 
Wire 15B at the terminal strip in the transfer switch.
a.  If  voltage  is  present  repair  or  replace  Wire  0 
between  transfer  switch  and  generator  ground 
lug.
b.  If voltage is not present proceed to Step 19.
19. Connect the negative (-) test lead to the ground lug in 
the generator control panel. Connect the positive (+) test 
lead to Wire 15B at the terminal strip in the generator 
control panel.
a.  If voltage is present, repair Wire 15B between 
generator  terminal  strip  and  transfer  switch 
terminal strip.
b.  If voltage is not present, proceed to Step 20.
20. Remove the J2 connector from the circuit board.
21. Set VOM to measure ohms. Connect one meter test lead 
to Wire 15B at the control panel terminal strip. Connect 
the other meter test lead to Wire 15B Pin Location J2-8. 
Continuity should be measured.
a.  If continuity is not measured, repair pin connection 
and  or  Wire  15B  between  the  J2  connector  and 
terminal strip.
b.  If continuity is measured proceed to Step 22.
22. Remove the 7.5A fuse.
23. Reconnect J2 connector.
24. Install the 7.5A fuse.
25. Disconnect Wire 15B from the generator terminal strip.
26. Set VOM to measure DC voltage.
*
   caution: after installing the 7.5a fuse and dis-
connecting Wire 15B from the generator termi-
nal strip, wait 5 minutes before proceeding.
27. Connect one meter test lead to Wire 15B. Connect the other 
meter test lead to Wire 0. 12 VDC should be measured.
a.  If 12 VDC is not measured, replace the printed 
circuit board.
b.  If  12 VDC  is  measured,  a  short  exists  on Wire 
15B  or  the  transfer  relay  is  shorted.  Repair  or 
replace as needed.
teSt 29 – teSt tranSFer relay tr
DISCUSSION:
In  automatic  operating  mode,  the  transfer  relay  must 
be energized by circuit board action or standby source 
power will not be available to the standby closing coil. 
Without  standby  source  power,  the  closing  coil  will 
remain de-energized and transfer to “Standby” will not 
occur. This  test  will  determine  if  the  transfer  relay  is 
functioning normally.
15B
COIL NOMINAL RESISTANCE = 120 Ohms
N1A
126
205
E1
23
Figure 3. Transfer Relay Test Points
PROCEDURE:
1.  See  Figure  3.  Disconnect  all  wires  from  the  transfer 
relay, to prevent interaction.
2.  Set a VOM to its “R x 1” scale and zero the meter.
3.  Connect  the VOM  test  leads  across  Relay Terminals  6 
and 9 with the relay de-energized. The VOM should read 
INFINITY.
CONNECT VOM TEST 
LEADS ACROSS
DESIRED METER READING
ENERGIZED 
DE-ENERGIZED
Terminals 6 and 9 
Continuity 
Infinity
Terminals 1 and 7 
Infinity 
Continuity