Texas Instruments BQ24278EVM-759 Evaluation Module BQ24278EVM-759 BQ24278EVM-759 Datenbogen

Produktcode
BQ24278EVM-759
Seite von 23
Test Summary
Observe
D1 and D2 are on.
7. Move JP3 (CD) = HI.
8. Measure on VM #3
V(J4(SYS), J8(GND)) = 0 V.
9. Disable PS #1 and disconnect electronic load or resistor box and CM #3 from the HPA759 board.
2.4.2
Charge Voltage and Current Regulation of IN
1. Ensure that the
steps are followed.
2. Move JP2 (CE) = HI and JP3 (CD) = LO.
3. Connect the output of PS #1 in series with CM #1 to J1 and J3 or J2 (IN, GND).
4. Connect VM #1 across J1 or TP1 and J3 or TP5 (IN, GND).
5. With PS #2 disabled, turn on PS #1.
6. Measure:
Measure on VM #3
V(J4/TP4(SYS),J8(GND)) = 4.3 ± 100 mV
Measure on VM #4
V(J12(DRV),J14(GND)) = 5.2 ± 200 mV
Measure on CM #2
I
CHRG
= 0-20 mA
7. Move JP2 (CE) = LO while keeping the default settings for JP1 (FET GATE), JP3 (CD) and JP4 (TS).
8. Enable PS #2 and adjust PS #2 so that the voltage measured by VM #2, across BAT and GND,
measures 2.5 - 2.7 V.
9. Measure:
Measure on CM #2
I
CHRG
= 40 ± 10mA
10. Slowly increase the voltage on PS #2 until:
Measure on CM #2
I
CHRG
= 2500 mA ± 250 mA
11. Adjust PS #1 so that VM #1 still reads 6 V ± 100 mV, if necessary.
Measure on CM #2
I
CHRG
= 2500 mA ± 250 mA
Measure on CM #1
I
IN
< 2100 mA
Observe
D1 and D2 are on.
12. Turn off PS #1 and PS #2.
2.4.3
Helpful hints
1. Observe the taper current as the battery voltage approaches the set regulation voltage by allowing the
battery to charge or if using BAT_Load (PR1010), slowly increase the PS #2 voltage powering
BAT_Load (PR1010). Use VM #2 across BAT and GND to measure the battery voltage seen by the IC.
2. Observe the V
INDPM
function by lowering the current limit on PS #1.
3. Observe battery supplement mode by applying a resistive load across SYS and GND that is higher
than the maximum charge current.
9
SLUU917 – April 2012
QFN-Packaged bq24278 Evaluation Module
Copyright © 2012, Texas Instruments Incorporated