Utica Boilers SSC Benutzerhandbuch

Seite von 12
6
Operational State
Front 
Panel 
Status   
Indicators
User Interface Display
Explanation
Boiler operates in standby mode until 
demand for Central Heat (CH) or 
Domestic Hot Water (DHW) detected.
Call for heat.
CH/System or DHW pump turned ON 
based on type of heating demand. Heat 
Exchanger Pump also turned ON.
(CH demand illustrated) 
Combustion Air Blower energized.
Combustion Air Blower speed             
modulates to prepurge setting for 15 
seconds.
Igniter energized to start sparking 
sequence.
Gas Valve energized to deliver air/fuel to 
burner.
Igniter de-energized.
Boiler runs provided all operational and 
safety devices within limits.
Control Module adjusts fi ring rate to 
match heating demand.
Call for heat ends. Post purge cycle for    
30
 
seconds.
Combustion Air Blower modulates to post   
purge setting.
CH/System Pump, DHW pump, and Heat     
Exchanger Pump operate.
Boiler returns to Standby Mode.
4.4 Sequence of Operation
4 - CONTROL MODULE
Ready for
Operation
Thermostat Starts
Call for Heat
Pre-Purge
Trial for Ignition
Thermostat Ends
Call for Heat
Post-Purge
Normal Operation
Ready for
Operation