Index 37
A
about this guide
5
areas prone to lightning or power surges
21 assembly
29
assembly area
23 C
capacity limitations
7
clearance area
8 cold weather considerations
21
communication connections
18, 19 connection portals
16
connections, additional
16
connections, facility
16 D
delivery considerations
29 E
electrical power capacity
7
electrical system
15 environmental considerations
21
environmental control system (ECS)
16
environmental risks
21 equipment, installation
23 F
facility connections
16
fire and safety
18
fire suppression
6 G
grounding requirements
11 H
HP site preparation drawing package
22 I
installation equipment
23 L
lifting layout and requirements
23
lightning protection
21 M
materials, piping
14
mechanical cooling capacity
7 modifications, FCC notice
33 O
other objects
25
overview
5 P
permit requirements
22
piping materials
14 power infrastructure installation
14
power surges
21
pre-delivery
29 preparing for assembly
29
project coordination
22 R
regulatory compliance identification numbers
33
regulatory compliance notices
33 regulatory compliance, HP POD 20c
5, 32 S
safety information
6, 33
security
6, 18
seismic activity
21 site assessment
6, 22, 26
site assessment checklist
26 Index