HP Performance Optimized Data Center (POD) 20cp 빠른 설정 가이드

다운로드
페이지 38
 
Index  37 
A 
about this guide   5 
areas prone to lightning or power surges   21 
assembly   29 
assembly area   23 
C 
capacity limitations   7 
clearance area   8 
cold weather considerations   21 
communication connections   18, 19 
connection portals   16 
connections, additional   16 
connections, facility   16 
D 
delivery considerations   29 
dimensions   8 
drainage   13 
E 
electrical power capacity   7 
electrical system   15 
environmental considerations   21 
environmental control system (ECS)   16 
environmental risks   21 
equipment, installation   23 
F 
facility connections   16 
fire and safety   18 
fire suppression   6 
future expansions   10 
G 
grounding requirements   11 
H 
HP site preparation drawing package   22 
humidifier   12, 17 
I 
installation   23 
installation equipment   23 
L 
lifting layout and requirements   23 
lightning protection   21 
M 
materials, piping   14 
mechanical cooling capacity   7 
modifications, FCC notice   33 
O 
other objects   25 
overview   5 
P 
permit requirements   22 
piping materials   14 
power infrastructure installation   14 
power surges   21 
pre-delivery   29 
preparing for assembly   29 
project coordination   22 
R 
regulatory compliance identification numbers   33 
regulatory compliance notices   33 
regulatory compliance, HP POD 20c   5, 32 
S 
safety information   6, 33 
security   6, 18 
seismic activity   21 
site assessment   6, 22, 26 
site assessment checklist   26 
site pad   8 
Index