Vogelzang International PB65XL Benutzerhandbuch

Seite von 14
VGZ-003 / 20110524.0  
PB65XL / 
Page 3
 
 
tools
 
required
CAUTION: STOVE IS HEAVY. mAkE SURE YOU 
HAVE  ADEqUATE  HELP  AND  USE  PROPER 
LIFTING TECHNIqUES wHENEVER  mOVING 
STOVE.
Refer  to  diagram  and  parts  lists  at  back  of  this 
manual.
1.  Uncrate  the  stove  and  remove  all  protective 
packing  materials  and  protective  poly  bag. 
(Save cardboard carton for further assembly.)
2.  Remove  parts  from  inside  of  stove.  Parts  
include: one lid (#1), one lid lifter (#2), one 
ash door (#16) with one slide draft (#17), one 
ash  drawer  (#19),  four  legs  (#15),  hardware 
pack (#21), draft damper (#20), and one Spring 
Handle (#9) from inside the firebox.
3.  Place  flattened  carton  on  floor  and  carefully 
turn stove over onto carton.
4.  Securely attach all four legs to base of stove 
with stove bolts.
5.  Carefully  lift  stove  upright  and  place  in  
desired  location  (see  following  instructions  
f o r   p r o p e r l y   l o c a t i n g   s t o v e   f r o m  
combustible materials).
6.  Place lid (#1) in position on top plate.
7.  Place  ash  drawer  (#19)  into  lower  chamber 
(#13). Position ash door (#16) with slide draft 
(#17) on front of lower chamber (#13).
ASSEmblY INSTRUCTIONS
materials
 
required
 (NOTE: The following items are NOT included with your stove)
8.  Place shaker grate (#12) in lower chamber.
9.  Install flue pipe draft damper (#20) into the 
top  end  of  the  first  straight  section  of  stove 
pipe (fig.1) exiting the stove before the stove 
is used.
a.  Drill two 1/4” holes centered on either side of 
the pipe section 6” from the top end of the pipe 
(figure 1).
b.  Remove the handle from the damper then slide 
the damper into the pipe.
c.  Align the damper with the holes drilled in step 
9a and insert the handle through the holes and 
the damper.
NOTE: THIS DAmPER IS NECESSARY FOR THE  
PROPER  OPERATION  OF THE  STOVE  AND 
TO  mEET  EPA  EmISSIONS  REqUIREmENTS 
FOR HEATING APPLIANCES. IT mUST BE IN-
STALLED BEFORE USE. (NO EXCEPTIONS) 
10. Attach  stove  piping  —  see  instructions  on 
page 5.
1/8” dia. Drill Bit  
(sheet metal screws)
Phillips Style Screwdriver
14mm Nut Driver or Ratchet  
with 14mm Socket (for 14mm  
Hex Nuts & Stove Bolts)
Safety Glasses
Hearth Gloves
Pencil
6 foot Folding Rule or  
Tape measure
Tin Snips
Drill: Hand or Electric
Flooring Protection: 54” x 63” 
min. as specified (see page 4)
Chimney Connection: 6” black 
steel  (24  ga.  min.)  straight  or  
elbow (as required)
1/2” Sheet metal Screws
Chimney: Existing 6” Lined ma-
sonry Chimney or 6” Inside Dia. 
listed Type HT chimney.
Furnace Cement (manufacturer 
recommends Rutland Code 78 
or equivalent)
6"/15.25 cm
Draft Damper
(must be installed 
before use — NO 
EXCEPTIONS!)
NOTICE: Vogelzang International Corp. grants no warranty, stated or implied, for the installation or maintenance of  
your wood stove and assumes no responsibility of any incidental or consequential damages.
Fig. 1 – Draft
Damper Installation