Utica Boilers UB95M-200 Installationsanweisungen

Seite von 52
Figure 10  - Gas Piping
9.3 Leak Check Gas Piping
After making gas connections, open manual shutoff 
valve(s) and check all gas connections for leaks before 
placing boiler in operation.
Locate leakage using gas detector, noncorrosive detection 
fluid, or other leak detection method acceptable to 
authority having jurisdiction. Do not use matches, candles, 
open flames, or other methods providing ignition source. 
Correct leaks immediately and retest.
9 - GAS SUPPLY PIPING
DANGER
Fire Hazard.  Do not use matches, candles, open 
flames, or other methods providing ignition source. 
Failure to comply will result in death or serious        
injury.
!  
18