Saleen 10-8002-C11790A Benutzerhandbuch

Seite von 20
 
14
 
 
VI Front Struts Installation 
Part Number 
Description 
Qty. 
06-1302-B09913* 
Strut Front Assembly Coupe 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 1 
Figure 2 
Order of Operations: 
1.  With notch facing outside of the 
vehicle, slide studs in top of strut into 
four upper mounting holes; be sure 
the brake line sits behind strut 
assembly before tightening the strut 
in place. (Figure 1)   
2.  Use a 13mm deep socket with the 
3/8” impact gun to tighten a nut over 
each of the four studs (Figure 5, p. 8). 
Torque to 26 ft.-lbs. 
3.  Pull up wheel hub and attach the 
bottom of the strut to the knuckle 
using stock bolts and nuts. Use the 
3/8” impact gun and 18 mm deep 
socket to tighten (Figure 2). Torque 
to 148 ft-lbs.
 
4.  Put the sway bar end link stud into 
rear most hole on strut tower, tighten 
using a ½” impact gun with a 18mm 
deep socket. (Figure 3) Torque to 85 
ft-lbs.
 
5. 
Bolt brake line to rear of strut tower 
using 10mm socket and 3/8” impact 
gun. (Figure 5) 
 
Obtain the following tools: 
•  ½” impact gun 
•  18mm deep socket, ½” drive 
•  3/8” impact gun 
•  18mm deep socket, 3/8” drive 
•  ¼” air wrench 
•  13 mm deep socket, 1/4” 
drive 
•  13 mm deep socket, ½” drive 
•  10 mm deep socket, ¼” drive 
•  Ft-Lb torque wrench, ½” 
drive 
Figure 3 
Rear of 
vehicle 
End 
link