V. GAS SUPPLY
CAUTION
DURING PRESSURE TESTING NOTE THE FOLLOWING:
1. The oven and its individual shutoff valve must be discon-
nected  from  the  gas  supply  piping  system  during  any
pressure testing of that system at test pressure in excess
of 1/2 psi (3.45 kPa).
2. The oven must be isolated from the gas supply piping
system  by  closing  its  individual  manual  shutoff  valve
during  any  pressure  testing  of  the  gas  supply  piping
system at test pressure equal to or less than 1/2 psi (3.45
kPa).
3.  If  incoming  pressure  is  over  14"  W.C.  (35mbar),  a
separate regulator MUST be installed in the line BEFORE
the individual shutoff valve for the oven.
WARNING: To prevent damage to the control valve regu-
lator during initial turn- on of gas, it is very important to
open the manual shutoff valve very slowly.
After the initial gas turn-on, the manual shutoff valve must
remain open except during pressure testing as outlined
in  the  above  steps  or  when  necessary  during  service
maintenance.
A.
Gas Utility Rough-In Recommendations
The  following  gas  system  specifications  are  STRONGLY
RECOMMENDED.    Deviating  from  these  recommendations
may affect the baking performance of the oven.
Gas Meter - 650 cfh (307
l
/min) meter
Gas  Line
DEDICATED LINE from the gas meter to the oven
2"  (50.8mm)  pipe  for  natural  gas
1-1/2"  (38.1mm)  pipe  for  propane
Maximum length:  200' (61m).  Each 90° elbow equals 7'
(2.13m) of pipe.
B.
Gas Conversion
Ovens  are  shipped  from  the  factory  configured  for  use  with
natural  gas.    If  permitted  by  local,  national  and  international
codes,  the  oven  may  be  converted  to  propane  gas  operation
using a Gas Conversion Kit that is supplied with the oven.  Gas
orifice sizes supplied with the Kit match those shown in Tables
1-4 and 1-5 in the Description section of this Manual.
Where permitted by local and national codes, it is possible to
convert ovens from natural  to propane gas, or from propane to
natural gas, after the oven has been installed.  Gas Conversion
Kits are available from Middleby Marshall for this purpose.
C.
Connection
WARNING
Some procedures in this section may require conver-
sions,  readjustments,  or  service  on  the  oven's  gas
system.  Before performing these procedures, check that the
main gas supply valve and the circuit breaker/fused discon-
nect are in the OFF ("O") position.  After completing these
procedures,  perform  a  gas  leak  test  before  operating  the
oven.
CAUTION
The terms of the oven's warranty require all start-ups, conver-
sions and service work to be performed by a Middleby Marshall
Authorized Service Agent.  The installation, start-up and changes
required when changing from one gas type to another can be
performed  ONLY  by  a  certified  professional.
NOTE: Certain safety code requirements exist for the installation
of gas ovens; refer to the beginning of Section 2 for a list of the
installation  standards.  In  addition:
In the USA, the installation must conform with local codes,
or in the absence of local codes, with the National Fuel Gas
Code, ANSI Z223.1.
In Canada, the installation must conform with local codes,
or  in  the  absence  of  local  codes,  with  the  Natural  Gas
Installation  Code,  CAN/CGA-B  149.1,  or  the  Propane
Installation Code, CAN/CGA-B 149.2, as applicable.
In Australia, the installation must conform with AGA Codes
AG311  and  AG601,  and  with  any  requirements  of  the
appropriate statutory authority.
In  CE  countries,  the  gas  supply  connection  should  be
according  to  EN-203  (gas  appliance  directive)  and  to
applicable  ISO  228-1  or  ISO  7-1  recommendations.    All
aspects  of  the  gas  supply  connection  must  comply  with
current  IEC/CEE  requirements  and  with  all  applicable
local,  national,  and  international  codes.
For all ovens equipped with casters, the gas line connection
shall  be  made  with:
-
A  connector  that  complies  with  the  Standard  for
Connectors for Movable Gas Appliances, ANSI Z21.69
(in USA), or Connectors for Movable Gas Appliances,
CAN/CGA-6.16 (in Canada).
Check  the  oven’s  gas  supply  requirements  to  determine  the
type of gas to be used with the oven.  If the gas type required does
NOT match the local supply:
For  North  American  installations,  a  conversion  kit  is
supplied  with  the  oven  to  allow  operation  using  propane
gas. Refer to Part B, Gas Conversion, in this section.
For CE ovens, directions for converting the oven for use with
other gases are described in Part D.1, Preparation for Use
with  Various  Gases,  in  this  section.
If the installation will use the supplied gas hose, be sure that
the 1/2" to 3/4" gas line fitting is attached.  Refer to the instructions
in the gas hose package.  One gas line connection method is
shown in Figure 2-15; however, compliance with the applicable
standards  and  regulations  is  mandatory.
Inlet  and  regulated  gas  pressures  can  be  measured  using  a
“U” tube manometer at the tap locations shown in Figures 2-15
and  2-16.
SECTION 2 - INSTALLATION
Figure 2-15 - Flexible Gas Hose Installation
To Gas
Supply
Pipe
90°
Elbow
Quick-
disconnect
device
Flexible
Gas Hose
Full-Flow
Gas
Shutoff
Valve
3/4" gas
pipe nipple
3/4"-1/2"
gas pipe
reducer
Individual gas
connection  for
each oven
cavity
1/2" gas
pipe nipple
1/2" gas line
tee with
pressure tap