Site requirements  9 
Leveling requirements 
The site location for the HP POD must be level +/- 0.5 degree tolerance. 
 
Grounding requirements 
  
 
IMPORTANT:
  Before installing the HP POD, consult your local AHJ for applicable codes and to 
review site-specific location guidelines. 
  
The HP POD must be grounded in accordance to local electric code. HP recommends grounding the HP 
POD, the transformer and switchboard, and the water distribution kit to your ground grid system for full 
protection. 
 
Lightning protection 
If the HP POD is installed in an outdoor environment, HP recommends hiring a lightning protection 
consultant to evaluate potential lightning risks and assess possible HP POD lightning protection schemes. 
 
Component documentation 
The Operations and Maintenance Manual, that includes all contractor-installed component documentation 
and all server and IT equipment documentation is delivered with your HP POD.