Site requirements 9
Leveling requirements
The site location for the HP POD must be level +/- 0.5 degree tolerance.
Grounding requirements
IMPORTANT:
Before installing the HP POD, consult your local AHJ for applicable codes and to
review site-specific location guidelines.
The HP POD must be grounded in accordance to local electric code. HP recommends grounding the HP
POD, the transformer and switchboard, and the water distribution kit to your ground grid system for full
protection.
Lightning protection
If the HP POD is installed in an outdoor environment, HP recommends hiring a lightning protection
consultant to evaluate potential lightning risks and assess possible HP POD lightning protection schemes.
Component documentation
The Operations and Maintenance Manual, that includes all contractor-installed component documentation
and all server and IT equipment documentation is delivered with your HP POD.