Hoshizaki MODULAR CRESCENT CUBER SERENITY SERIES KMS-1400MLH Benutzerhandbuch

Seite von 56
1
B. Sequence of Operation
The steps in the sequence are as outlined below. When power is supplied, the red 
POWER OK LED and the green BC CLOSED LED on the control board come on (If the 
yellow BC OPEN LED is on, the unit will not start. In this case clear ice away from the 
bin control actuator in the bin area). A 5-second delay occurs at startup. Note that the 
order of the green sequence LEDs from the outer edge of the board is 1, 4, 3, .
1. One Minute Fill Cycle
LED 4 is on. FWV opens and the fill period begins. After 1 minute, the board checks 
for a closed LF/S. If LF/S is closed, the harvest cycle begins. If not, FWV will remain 
energized through additional 1 minute cycles until water enters the sump and LF/S 
closes. This serves as a low water safety to protect the water pump.
2. Initial Harvest Cycle 
LEDs 1, 4 and  are on. Comp, FMR, HGVs, HWV and X1 relay energize, FWV closes. 
The control board monitors the warming of the evaporator via the thermistor located 
on the suction line. When the thermistor reaches 48°F (9°C), the control board reads a 
3.9 kΩ signal from the thermistor and turns harvest termination over to the adjustable 
harvest timer which is factory set for normal conditions. The timer has settings of 60, 
90, 10, and 180 seconds (S4 dip switch 1 & ). When the harvest timer completes its 
count down, the harvest cycle is complete and the freeze cycle starts. The minimum 
total time allowed by the board for a complete harvest cycle is  minutes. HWV is open 
during harvest for a maximum of 6 minutes or the length of harvest minus 50 seconds, 
whichever is shorter. LED 4 goes off when HWV closes. PM energizes and runs for the 
last 50 seconds of harvest. LED 3 comes on when PM energizes. At the end of harvest, 
the control board checks the position of LF/S and proceeds to the freeze cycle if it is 
closed or calls for a 1-minute fill if it is open.
3. Freeze Cycle 
LED 1 is on. Comp, FMR and PM continue to run, LLVs open, HGVs close. For the first 
5 minutes, the control board will not terminate the freeze cycle. As ice builds and LF/S 
opens, FWV opens (LED 4 is on when FWV is open). The refill will last until U/FS closes 
or for 60 seconds, whichever is shorter. After UF/S closes, FWV closes 3 seconds later. 
The KMS-1400MLH refills 1 time. After the refill, the freeze continues until LF/S opens 
again. The freeze cycle is then terminated, provided the 5 minute freeze timer has 
expired. 
4. Pump-Out Cycle
The 1st pump out occurs after the 11th freeze cycle and every 10th cycle thereafter. 
LEDs 1, 3, and  are on. Comp and FMR continue to run, DWV opens, HGVs open, 
LLVs close. PM stops for  seconds. PM restarts, pumping water from the water tank 
through the DWV and down the drain. At the same time, water flows through the vent 
tube to power flush the F/S. After 10 seconds, the pump out is complete. The pump-out 
frequency control is factory-adjusted to drain the water tank every 10 cycles, and no 
adjustment is required. However, where water quality is bad and the icemaker needs a 
pump out more often, the pump-out frequency can be adjusted. See "II.C.3.d) Pump-Out 
Frequency Control."