ACS Food Saver A0571050 Benutzerhandbuch

Seite von 53
Pumps & Conveying System Components   Chapter 3: Installation
33
Plug the controllers’ power cord into a properly grounded, 3-slot, 115/1/60 VAC or 230/1/60
VAC receptacle as specified on the control panel serial tag and the enclosed controller
Operation and Instruction manual. The control enclosure draws less than 5 amps during
normal operation at 115/1/60 VAC.
Caution! 
The manufacturer recommends that you protect PLC memory by providing
the control panel with a dedicated circuit, a true earth ground, and a
spike/surge protector.
Connecting the Control Panel to the Pump Package
Note:  Consult the specific schematics and Operation & Instruction manual
supplied with your controller for your specific application.
•  Wire the pump package motor starter coil (M) to the terminal provided in the
conveying system control panel enclosure.
•  Wire the pump package vacuum relief valve solenoid (SOL A) to the terminal provided
in the conveying system control panel enclosure.
•  Wire the pump package high vacuum switch (VS) to the terminal located in the
conveying system control panel enclosure.
Note:  Make sure that the pump motor starter, the vacuum relief valve
solenoid, and the blowback solenoid (if supplied) are the same voltage
(24 VDC) as the conveying system control panel control voltage.
Consult the control panel serial tag and the pump package serial tag.
Note:  Wire size depends on control voltage, distance, number of vacuum
hoppers, and the number of wires in each raceway. Consult a qualified
electrician.