Utica Boilers UB90-100 Installationsanweisungen

Seite von 3
3
6. 
Apply pipe dope to bushing threads. Install gas orifi ce 
assembly turning clockwise into mixer. DO NOT USE 
TEFLON TAPE.
7. 
Attach adapter block to gas valve. 
8. 
75 MBH: Chose table for correct type of fuel supplied 
to your boiler. Replace burner plate with plate listed in 
correct table. Different burner plate is used for Nat and 
LP fuels.
9. 
Install top panel. Restore electrical and gas supply. Set 
thermostat high enough to start boiler. Restart boiler. 
Check for gas leaks using soapy water or commercial 
leak detector.
10. 
Fill out data on adjustment/conversion label. Attach to 
inside left panel of boiler.
11. 
Install front door.
Operate boiler through at least 6 ignition cycles to check for 
proper operation of the boiler before leaving job site.
TABLE #2: PROPANE GAS
MODELS
  050 MBH
Stock Factory
Btu Value of Propane Gas++
Settings
2300
2350
2400
2450
2500
Altitude in Ft.
0-5,000
5,000-10,000
Normal Input (MBH)
50
Combustion Setting (CO
2
)
10.0 -11.1%  (CO 
100 ppm)
Orifi ce
43331095
Burner Plate
109006405
MODELS
 075 MBH
Stock Factory
Btu Value of Propane Gas++
Settings
2300
2350
2400
2450
2500
Altitude in Ft.
0-5,000
5,000-10,000
Normal Input (MBH)
75
Combustion Setting (CO
2
)
10.0 -11.1%  (CO 
100 ppm)
Orifi ce
43331093
43331096*
Burner Plate
109009107
* For model 075 LP units only at altitudes above 5,000 ft., install 075 MBH High Altitude Orifi ce
 
Kit #5550002629 which includes 
43331096 orifi ce.
MODELS 100 MBH
Stock Factory
Btu Value of Propane Gas++
Settings
2300
2350
2400
2450
2500
Altitude in Ft.
0-5,000
5,000-10,000
Normal Input (MBH)
100
Combustion Setting (CO
2
)
10.0 -11.1%  (CO 
100 ppm)
Orifi ce
43331091
Burner Plate
109009105
++Contact local gas utility or distributor for Btu value of gas.
HIGH ALTITUDE RATINGS FOR PROPANE
Figure 3 - Gas Valve Adapter Detail