Utica Boilers UB95M-200 Installationsanweisungen

Seite von 28
12
7 - DETAILED SEQUENCE OF OPERATION
POWER ON. UNIT IN STANDBY
THERMOSTAT CALLS FOR HEAT
INTERNAL MICRO CONTROLLER TEST
CIRCULATOR ENERGIZES
CONTROL CHECKS N O 
AIR PRESSURE SWITCH 
CONTACTS
COMBUSTION AIR 
BLOWER ENERGIZES
CONTROL ENTERS 
LOCKOUT ERROR CODE 
DISPLAYED
CONTROL NEEDS 
TO BE RESET FROM 
LOCKOUT
CONTROL WAITS FOR 
AIR PROVING SWITCHES 
TO CLOSE INDICATING 
SUFFICIENT FAN SUCTION 
PRESENT
CONTROL ENTERS 
LOCKOUT ERROR CODE 
DISPLAYED
CONTROL NEEDS 
TO BE RESET FROM 
LOCKOUT
CONTROL  ENTERS          
PRE-PURGE
COMBUSTION AIR 
BLOWER RUNS FOR 20 
SECOND PRE-PURGE
SPARK IGNITER 
ACTIVATES
GAS VALVE OPENS
UNIT LIGHTS AND 
FLAME RECTIFICATION
UNIT TRIES FOR 
IGNITION 5 TIMES
UNIT OPERATES 
NORMALLY
FALSE POSITIVE PROOF 
OF AIRFLOW
CONTROL ENTERS 
LOCKOUT ERROR CODE 
DISPLAYED
CONTROL NEEDS 
TO BE RESET FROM 
LOCKOUT
END CALL FOR HEAT
CONTROL ENTERS 30 
SECOND POST PURGE
UNIT ENTERS 
STANDBY,
 
WAITING 
FOR CALL FOR HEAT
CLOSED
OPEN
CLOSED
OPEN
YES
NO
ATTEMPT TO LIGHT
DOES NOT LIGHT AFTER 6 TRIES