Utica Boilers UB95M-200 Installationsanweisungen

Seite von 4
SUPPLEMENT
AL
 INSTRUCTION
95M-200 GAS-FIRED DIRECT VENT
MODULATING HOT WATER BOILER
 P/N 240005544, Rev. 1.1 [04/06]
!  
!  
HONEYWELL AM (HAM) 0-10VDC MOD-
ULE INSTALLATION INSTRUCTIONS
(Requires Kit# 550001314)
The Honeywell AM (HAM) kit allows the boiler’s mod-
ulation to be controlled by an external 0-10vdc signal 
supplied by most modulating multiple boiler controls.
WARNING
This  document  must  only  be  used  by  a  quali-
fied heating installer or service technician. Read 
all instructions, including this Supplement, the 
Boiler Installation Manual (p/n# 240006103), the 
Control  Manual  and  Operating  Instructions  (P/
N# 240006104), and the Parameter Guide (P/N# 
240006105), before installing. Perform steps in 
the order given. Failure to comply could result 
in  severe  personal  injury,  death  or  substantial 
property damage. 
IMPORTANT: The alarm contacts of the HAM mod-
ule are rated for 2 amps at 120 vac. All hard lockout 
conditions of the boiler control module will cause an 
alarm. Soft lockouts will not cause an alarm. 
In addition to mounting and wiring the HAM module 
to each boiler operated by the multiple boiler con-
troller,  you  will  need  to  program  the  boiler  control 
module of each boiler to accept a 0-10vdc input sig-
nal, as described in these instructions. 
IMPORTANT: Installation must comply with local re-
quirements and with the National Fuel Gas Code, 
ANSI Z223.1 for U.S. installations or CSA B149.1 or 
B149.2 for Canadian installations.