Elica ECN6XS2 Installationsanweisungen

Seite von 21
 
 
List of Materials 
 
Parts supplied 
Removing the packaging 
CAUTION! 
Remove carton carefully, Wear gloves to protect against 
sharp edges. 
 
WARNING! 
Remove the protective film covering the product before 
putting into operation. 
• Hood structure assembly with blower, transition. 
• 4 Lamps already installed. 
• 1 Grease filter 
• 4 Duct covers. 
• Hardware bag with: 
 
• Ceiling Mount Template 
 
• Use, care and installation guide 
 
• Wood screws (4 pieces - 3/16" x 1" 3/4) 
 
• Glass Brackets, Springs, Gaskets ( 2 each ) 
 
• Assembly screws (70 pieces) 
 
• 4 Plastic Springs 
 
• Duct cover brackets (4 each) 
• 8 Vertical supports. 
• 2 Upper Ductcover supports. 
• 2 Horizontal supports. 
• Glass canopy 
 
Parts not supplied  
  
Optional Accessories 
•  Ductless Recirculating Kit 
 
To  be  used  only  in  the  Ductless  (Recirculating) 
version 
 
includes:  charcoal  filter,  charcoal  filter  support  and 
fixing bracket, deflector 
  
  
Tools/Materials required 
•  Wire nuts 
•  Tape to mount template 
•  8" rounded metal duct length to suit installation 
•  Measuring tape  
•  Pliers 
•  Gloves 
•  Knife 
•  Safety glasses 
•  Electric drill with 5/16” and 3/8” Bits 
•  Strain relief 
•  Spirit level 
•  Duct tape 
•  Screwdrivers: 
 
Phillips (Posidrive) # 2 
 
Torx # 2 
•  Wire cutter/stripper 
•  Masking tape 
•  Hammer 
•  Saw, jig saw or reciprocating saw