Dacor ERV48ER Installationsanweisungen

Seite von 16
8
Installation Instructions
Back of Unit
Side 
Knock-out
Side 
Knock-out
Bottom 
Knock-out
Rear knock-out with 
metal cross overs 
shown
Vent Knock-out Locations
ADT2 side 
installation
ADT2 bottom 
installation
ADT2 Transition Installation
Floor
Cut hole in floor to allow 
duct to pass through on 
bottom venting installations
Top of vent resting 
on countertop
Installation Preparation
Verify Package Contents
Use and care manual
Anchoring legs
4 wood screws for anchor legs
3 wire nuts
ADT2 duct transition
2 sheet metal screws for ADT2 mounting
2 nuts and washers to secure anchor legs
Insulation foam

Verify that the raised vent and blower being installed are a 
matched pair before beginning the installation.
 WARNING
If the electrical service (electrical outlet) does not 
meet the Electrical Specifications on page 4, do 
not proceed with the installation. Call a licensed 
electrician and have an electrical outlet installed that 
meets the specifications.
Install the vent only in a vertical orientation. Do not mount 
the vent on a slant or angle.
Installing the Raised Vent
Remove the appropriate side, back or bottom exhaust 
1. 
knockout, depending on the duct configuration, from 
the raised vent assembly by cutting the metal cross 
overs and removing the insert.
Installation
Cut and remove the foil material inside the knock-out 
2. 
hole. If you fail to remove the foil, the vent will not work.
If the unit will vent through the bottom or side:
3. 
For side installations, attach the supplied ATD2 
transition to the side of the unit that will exhaust the 
air. Install an elbow to the transition with the output 
pointing down.
For bottom installations, attach the supplied ATD2 
transition to the bottom of the unit. Cut a hole in the 
cabinet floor to allow the exhaust transition and/or 
the duct to pass through the floor.