Maytag MEDP475EW Installationsanweisungen

Seite von 20
9
3.
 
Connect remaining wires
Connect remaining wires to outer terminal block screws. 
Tighten screws. Finally, reinsert tab of terminal block cover  
into slot of dryer rear panel. Secure cover with hold-down 
screw. Now, go to Venting Requirements. 
2.
 
Connect neutral wire
Connect neutral wire (white or center) (C) of power supply cord  
to center terminal block screw (B). Tighten screw.
C
B
Remove center terminal block screw (B).
B
1.
 
Remove center screw
Direct Wire Connection
Unscrew the removable conduit connector (A) and any  
screws from a 3/4" (19 mm) UL listed strain relief (UL marking 
on strain relief). Put the threaded section of the strain relief 
(C) through the hole below the terminal block opening (B). 
Reaching inside the terminal block opening, screw the 
removable conduit connector (A) onto the strain relief threads.
A
B
C
1.
 
Attach direct wire strain relief
Put direct wire cable through the strain relief. The strain relief 
should have a tight fit with the dryer cabinet and be in a 
horizontal position. Tighten strain relief screw against the direct 
wire cable.
2.
  
Attach direct wire cable to strain 
relief 
Direct wire strain relief
3-wire direct connection:
Go to 3-Wire Direct Connection on page 10.
4-wire direct connection:
Go to 4-Wire Direct Connection on page 10. 
If your wiring looks like this: