Monessen Hearth 6000DV Benutzerhandbuch

Seite von 52
22 
42D0200
HO
T
HOT
VENT INSTALLATION 
4.  Apply a bead of non-hardening mastic around the outside 
edge of vent cap. Position the vent cap in the center of  hole 
on the exterior wall with the word “UP” on the vent cap 
facing up. Insure proper clearance of 1" to combustibles 
is maintained. Attach the vent cap with four wood screws 
supplied. See Figure 22.
Do not recess vent termination 
into any wall. This will cause a 
fire hazard. 
W
ARNING
NOTE:  Replace  the  wood  screws  with  appropriate 
fasteners for stucco, brick, concrete, or other types 
of siding. 
For vinyl siding, stucco, or wood exterior use vinyl siding 
standoffs between vent cap and exterior wall. The vinyl siding 
standoff prevents excessive heat from melting the vinyl siding 
material. Bolt the vent cap to the standoff. Apply non-harden-
ing mastic around outside edge of the standoff instead of the 
vent cap assembly. Use wood screws provided to attach the 
standoff. See Figure 23.
5.  Slide fire stop over the vent pipe before connecting hori-
zontal run to vent cap. See Figure 24.
6.  Insert vent pipe into the horizontal termination. The pipe 
overlap should be a minimum of 1
1
/
4
". Fasten all vent 
connections with screws provided.
7.  Slide fire stop against the interior wall surface and attach 
with srews. See Figure 24.
Figure 22 - Installing Horizontal Vent Cap 
REAR WALL VENT INSTALLATION (continued)
Figure 23 - Installing Vinyl Siding Standoff 
Apply 
Mastic to 
All Four 
Sides 
Vent Cap
Wood 
Screw
Cut Vinyl Siding 
Away to Fit Standoff 
Wood Screw
Vent Cap
Bolt
Apply Mastic to 
All Four Sides 
Nut
Standoff 
Figure 24 - Connecting Vent Cap with Horizontal 
Vent Pipe 
Interior Wall 
Surface 
Horizontal 
Vent Pipe 
Screw
Vent Cap 
(Horizontal 
Termination)
Deflecting Shield 
Deflecting Shield