Patton electronic 3120 Benutzerhandbuch

Seite von 75
2 • Hardware installation
Model 3120 RAS Getting Started Guide
20
Introduction
Introduction
This chapter contains the following procedures for installing the Model 3120 RAS:
“Completing the hardware installation” on page 25—describes testing the RAS hardware to verify that it is 
ready for software configuration.
Unpacking the Model 3120 RAS
Inspect the shipping carton for external damage. Note any damage before removing the container contents. 
Report equipment damage to the shipping carrier immediately for claim purposes. Save all packing materials in 
case you need to return an item to the factory for servicing.
The RAS comes with the following items:
The 3120 Series Remote Access Server (RAS)
A DB-9-to-RJ-45 (EIA-561) cable, 10 foot (3 meters)
Control port interface cable, 10 foot (3 meters), standard CAT-5 cable
Two WAN connection cables, 10 foot (3 meters) each
Rack mounting kit with rack ears and mounting hardware
CD-ROM containing product literature and the following documentation:
-  Access Server Administrator’s Reference Guide
- Model 3120 RAS Getting Started Guide
Note
Power cables are shipped separately from the Model 3120 RAS.
RAS chassis installation
Do the following:
1. If you have not done so already, remove the RAS from its shipping container.
Note
The RAS should be placed as close as possible to the termination jack 
provided by the Telco. Avoid installing the RAS in a location where 
the power cords or network interface cables could be accidentally dis-
connected. The location should be well ventilated. Do not block the 
RAS’s cooling vents.
2. If you are installing the RAS in a 19-inch rack, go to step 3. Otherwise, place the RAS at the desired loca-
3. Install the rack mounting ears onto the RAS using the mounting hardware provided.
4. Place the RAS at the desired position in the rack.