Sterling 882.000254.00 Benutzerhandbuch

Seite von 91
7/50D Plus or 7/50D Controller 
Chapter 3:  Installation 
22 
Figure 7:  Securing the Seal Block to the Cable Base 
 
 
 
To secure the seal block: 
1.  Start the threads of each of the four captive screws into the cable base receptacle 
holes. 
2.  Drive each of the screws about halfway down, using the proper torque sequence: 
Bottom screw, top screw, left screw, right screw. Doing so insures that the cables are 
pierced evenly. 
3.  Using the proper torque sequence, tighten each screw, a little at a time, until the 
seal block is fully seated into the cable base. Tighten to no more than 8 to 10 inch-
pounds (3.0 to 3.7 N
m) of torque. 
The three seat lines on the seal block should meet the cable base, indicating that the 
seal block is fully seated. The seal block clips should also click into place onto the 
corresponding cable base slots.