A&D AD-4405 User Manual

Page of 80
AD-4405 Weighing Indicator
 Page 
 
3.1.5. 
Installing an Option Board 
 
This is the procedure for the data output board (OP-03, OP-05, OP-07 and OP-08). 
Caution 
  Do not remove any screws without the following step. 
Step 1  Remove the power cord from the power outlet (mains) and other cables from the 
indicator. 
Step  2  Remove two screws from the RS-232C panel at rear panel. 
Step  3  Remove the standard RS-232C panel and board from the indicator. 
Step  4  Remove the cable from the standard RS-232C board. 
Step  5  Connect the cable that was removed in step 4 to the new option board. 
 
  Please be careful to orientate the connector correctly. 
Step  6  If the option board has an earth terminal (OP-05, OP-08), connect the earth cable 
in the indicator to that terminal. 
Step  7  Insert the option board into the indicator. 
Step  8  Secure option board panel using two screws. 
Step  9  Set the F-Function(s). 
  
 
OP-07 
f30 1 (Analog output) 
  
 
OP-08 
f37 if current loop output is used 
 
 
 
 
3. Installation and Precautions