TE Connectivity LAN Cat.6 S/FTP 1-0959385-1 User Manual

Product codes
1-0959385-1
Page of 5
 
 
 
108-93010
 
 
Rev E 
3 of 5
 
 
INGF-070 
 
 
                                                                  
TRANSMISSION
 
                                                      Cat 6 Patch cord requirements 
Return Loss
(1) 
Cat 6 Return Loss cord requirements 
according to ISO/IEC 11801 2
nd
 Edition 
Amend. 2 
IEC 61935-2, Paragraph 5.6 
 
NEXT Loss 
Cat 6 NEXT Loss cord requirements 
according to ISO/IEC 11801 2
nd
 Edition 
Amend. 2  
IEC 61935-2, Paragraph 5.7 
 
                                                                     
MECHANICAL
 
Crimping Height 
Relevant IEC 60603-7-X standard 
Indicator  with  needle-point  probes  or 
equivalent. It shall be measured at the front 
of the contact. 
Tensile Strength 
 
Force  applied:  50  N  according  to  the 
standard. Duration: 5 seconds 
IEC 61935-2, Paragraph 6.2. 
(See figure 3 as information) 
Torsion Force 
(specified  by  Tyco 
Electronics) 
Force applied: 10 N x cm  
Duration: 5 seconds 
Maximum Rotation angle 45º 
(See figure 4 as information)
 
NOTE 
See Test Sequence in paragraph 4.2 Figure 6 
Figure 1Requirements and test procedures for Cat 6 shielded patch cords 
 
REMARK
(1) 
Return  Loss  values  below  4MHz  are  for  information  only  according  to  AMD2  to  ISO 
11801 2
nd
 Edition 
 
 
 
 
Figure 2: AMPTRAC connection continuity and short-circuit test procedure 
 
 
 
Figure 3: Tensile strength test procedure 
 
Figure 4: Torsion force test procedure 
 
Torque value to be applied between 
shield and cable jacket 
cm
N
10
 
Maximum rotation 
angle 45º 
 
Maximum distance 
between shield and 
cable clamp 5mm 
 
Test based on 
1 rotation x 1 side