Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
1094 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
!
CAUTION:
CAUTION:
The removal of hardware and fiber cable will interrupt service.
Note:
Note:
At this point in the downgrade procedure, the system is in unduplicated mode and 
is operational. The physical removal of the SN carriers may be done at a time that 
is convenient for the customer. The next step in the downgrade is to follow the 
normal upgrade procedures from standard to high reliability.
6.
change fiber-link n
Change fiber removes the b-pnc endpoints 
(EI, DS1Cs, if equipped).  n is the number of 
the fiber from step 4.  Repeat this step for 
every fiber from step 4.
7.
Physically remove the b-pnc 
endpoint circuit packs
Start with the switch carrier most distant from 
the media server. Physically remove EI, SNI, 
and SNC circuit packs associated with the 
b-pnc.
Remove fiber cable not used for b-pnc 
carriers.   See the following CAUTION.
8.
change circuit-packs
Update the translations for the removed circuit 
packs using change circuit-packs for 
the:
Cabinet with b-pnc SN carrier
- SNIs
- SNCs
- EIs and DS1Cs, if any
Cabinet with b-pnc SN carrier
- DS1Cs from port carrier
Cabinet with b-pnc EIs in every PN 
(also DS1Cs, if equipped)
9.
change cabinet UU
Remove the b-pnc SN carrier. 
10.
Disable duplication.
Obtain a license file to disable PNC 
duplication.
Table 372: Downgrading from Critical to High Reliability  (continued)
Step # Command/Step
Description
 2 of 2