Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
1504 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
Battery Holdover Hardware
Verification Test (#311)
The hardware/firmware vintage of the PN’s TN775D Maintenance boards does not support 
battery holdover for all carriers. This test checks to see if PN cabinet battery holdover for all 
carriers
 has been administered in error. If battery holdover is administered for all carriers, the 
test will fail and a t alarm will be raised against this MO.
PASS
The active EI circuit pack can reset the PN’s Maintenance circuit pack. 
This implies the Maintenance circuit pack, the active EI circuit pack, and 
active serial link are sane. There could still be a problem with the standby 
EI circuit pack and standby serial link in a Duplication Option system.
Table 540: Test #306 PN Maintenance Circuit Pack Reset Test  (continued)
Error
Code
Test
Result
Description / Recommendation
 4 of 4
Table 541: TEST #303 PN Maintenance Circuit Pack Sanity Maze Test 
Error
Code
Test
Result
Description/ Recommendation
1000
ABRT
System resources required to run this test are not available.
1. Retry the command at 1-minute intervals up to 5 times.
2000
ABRT
Response to the test was not received within the allowable time period.
1. Retry the command at 1-minute intervals up to 5 times.
2029
ABRT
Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
2500
ABRT
Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
 1 of 2