Avaya 03-300430 User Manual

Page of 2574
SNI-BD (SNI Circuit Pack)
Issue 1 June 2005
2077
 
2. Run test led to a port network as described above to verify this fiber connection.
3. Repeat this procedure for each of the other SNI-to-SNI fibers terminating on this distant 
switch node.
Another method for testing multiple fiber connections to a distant switch node is described 
below.
1. Use list fiber-link to see the number of SNI-to-SNI fibers that are administered to 
and terminating on this switch node.
2. Run test led port-network on a PN connected to this distant switch node, and verify 
that the LEDs on the correct PN are lit.
3. Use status sys-link and select the active EI in the IPSI connected PN connected to 
the distant switch node being tested. This shows the path from the IPSI connected PN and 
the SNI-to-SNI fiber being used in this path.
4. If the port network LEDs are lit and multiple SNI-to-SNI fibers connect to this distant switch 
node, physically remove the SNI that is listed in the path.
If not lit, check that the fiber connections to the PN are consistent with the administered 
fibers (list fiber-link) that do not light the LEDs as expected.
5. Use status sys-link to see the new path from the IPSI connected PN to the this distant 
switch.
6. Run test led port-network on a PN connected to the distant switch node and verify 
that the LEDs on the correct PN are lit.
7. Repeat Steps 4 – 6 until the last SNI-to-SNI fiber to this distant switch node has been 
tested.
Table 752: TEST #759 Configuration Audit 
Error
Code
Test
Result
Description / Recommendation
2100
ABRT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2300
ABRT
The downlink message necessary to run this test could not be sent.
1. Retry the command at 1-minute intervals up to 3 times.
2301
ABRT
The software timer could not be set before sending the downlink message 
necessary to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
 1 of 13