Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
616 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
Test Synchronization Test (#417)
This test updates all the Synchronization Maintenance component circuit packs with the correct 
information regarding their role in providing synchronization for the system.  All the Tone-Clock, 
ATM Expansion Interface, DS1 Interface, and UDS1 Interface circuit packs in the system are 
updated through this test.  This test either passes or aborts.
Table 204: Test #417 Test Synchronization Test
Error 
Code
Test 
Result
Description / Recommendation
1000
ABRT
System resources required to run this test are not available.
1. Retry the command at 1-minute intervals up to 3 times.
1115
ABRT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2500
ABRT
Internal system error
PASS
The synchronization maintenance component circuit pack parameters 
have been successfully updated.  The system should be synchronized 
after successful execution of this test.
1. If synchronization problems still exist, refer to the Error Log to obtain 
information regarding the source of the problem.