Roberts Gorden TF-Series User Manual

Page of 44
ROBERTS GOR DON
® 
T F-S
E RIE S
 S
UB MI TT AL
 S
HEE T
© 2004 Roberts-Gordon
APPL ICATION S,  ENGI NEE RING AND  DET AI LE D GUID ANCE  ON SYST EMS DE SIGN,  INSTAL LATI ON AND PRODUCT   PE RFORMANCE  IS AVAI LABLE  UPON RE QUEST.  ROBERT S  GORDON
®
 PRODUCT S  ARE  T O BE 
INSTAL LE D ONL Y  IN ACCORDANCE  WI TH L OCAL L AWS, CODES AND  REGUL AT IONS,  AND  ONLY BY A CONT RACT OR QUALI FIE D I N THE  I NST ALL AT ION  AND  SE RVICE  OF GAS-FIRE D HE AT ING  EQUI PME NT.
TF-SERIES ASSEMBLY OVERVIEW 
Major Component Descriptions
Burner with Tube Gasket
Must be installed with the 
flame observation 
window facing down.
Reflector 
(Aluminum or 
Stainless 
Steel)
Alternate overlap as 
shown on overview and 
on Page 10, Figure 
Minimum overlap is 7” (18 cm).
Tube and Reflector Hanger 
with Clamp Package
Position this hanger no more 
than 4” (10 cm) away from 
the burner.
Coupling Assembly 
with Lock
Reflector End Cap
Punch out center 
section to 
accommodate heat 
exchanger tube.
Tube and Reflector Hanger
Suspend system from these 
hangers.
Flex Gas Line with 
Shut Off Cock
Tube
Hot Rolled or Heat 
Treated Aluminized Tube 
Supplied in 10’ (3 m) lengths.
Burner Tube
Supplied in 10
'
 
(3 m) lengths. Burner 
tube is always the first tube 
after the burner.
Reflector Support Strap & 
Wire Form
Turbulator
Turbulator must be 
installed in the last standard 
section of tube. Turbulator is 
not required on the TF-250/
300/350/380. For installation 
see Page 15, Section .
Flexible Boot
Flexible boot is used to 
connect the last tube to 
the vent.
Vent Sleeve
Vent Sleeve installed 
inside flexible boot.