HEATER INSTALLATION
Critical Hanger Placement
Hanger
Side View
Must Be Within 4" (10 cm)
Front View
S Hooks
Reflector
Hanger
45° Angle
* Allows for thermal expansion of system
Typical Suspension Details
Rod (3/8")
Beam Clamp
Concrete Beam
Wood Beam
Washers
Locknut
Screw Hook
(3/8")
24" min.*
(61 cm)
“X”*
Anchor
“S” Hooks
Chain size
3/16" minimum
Turnbuckle
Not Included
Description
Par t Number
S-Hook
91907302
Tube/Reflector Hanger
03090100
Total Str aight Length (both si des) or  Length from U-Tube to U-Tube 
i n a Double "U" Layout
Typical Expansion
Each Si de
Minimum “X”  Length
0’ - 50’
±1” (3 cm)
12” (31 cm)
51’ - 60’
±2” (5 cm)
18” (46 cm)
61’ - 80’
±3” (8 cm)
24” (61 cm)
81’ - 100’
±4” (10 cm)
30" (76 cm)
101’ - 120’
±5” (13 cm)
36" (91 cm) 
121’ - 140’
±6” (15 cm)
42" (107 cm)
141’ - 160’
±7” (18 cm)
48" (122 cm)
If the installation requires a shorter suspension length than the minimum listed, the suspension 
length may be reduced by 6" (16 cm). In this case tube clamps MUST be used at the two farthest 
hangers on each side of the burner. See Page 8, Figure .