Regency U32-NG4 User Manual

Page of 40
23
U32-4 FPI Direct Vent Gas Insert
OPTIONAL REMOTE 
CONTROL 
Use the FPI  Remote Control Kit approved for 
this unit. Use of other systems may void your 
warranty.
The remote control kit comes with a hand held 
transmitter, a receiver and a wall mounting 
plate.
1)  Choose a convenient location on the wall 
to install the receiver and the receptacle 
box (protection from extreme heat is very 
important). Run wires from the fi replace to 
that location. Use Thermostat Wire Table.
2)  Connect the wires as per the wiring diagrams 
below.
FINAL CHECK
Before leaving this unit with the customer, the 
installer must ensure that the appliance is fi ring 
correctly. This includes:
1)  Clocking the appliance to ensure the 
correct fi ring rate (rate noted on label) at 
15 minutes.
2)  If required, adjusting the primary air to ensure 
that the fl ame does not carbon. First allow 
the unit to burn for 15 min. to stabilize.
3)  Check for proper draft.
CAUTION
Any alteration to the product that 
causes sooting or carboning that 
results in damage to the exterior 
facia is not the responsibility of 
the manufacturer.
CAUTION
Do not connect the millivolt 
remote control wires for 
to the 120V wires.
3)  Install 3 AAA alkaline batteries in transmitter 
and 4 AA alkaline batteries in  the receiver. 
Install the receiver and its cover in the wall. 
Switch the  remote receiver to "remote" 
mode. The remote control is now ready for 
operation.
OPTIONAL WALL 
THERMOSTAT 
A wall thermostat may be installed if desired, 
follow the wiring diagram below. FPI offers an 
optional programmable thermostat but any 
250-750 millivolt rated non-anticipator type 
thermostat that is CSA, ULC or UL approved 
may be used.
14 GA.
16 GA.
18 GA.
20 GA.
22 GA.
50 Ft.
32 Ft.
20 Ft.
12 Ft.
9 Ft.
Recommended Maximum Lead Length 
(Two-Wire) When Using Wall 
Thermostat (CP-2 System)
Wire Size                       Max. Length
Thermostat Wire Table
CAUTION
Do not connect the millivolt wall 
thermostat wires 
to the 120V wires.
2)  Mount the 3-panel Screen Door / Frame 
Assembly to the fl ange on Sub-Frame, 
ensuring to line-up holes. Secure using the 
4 screws provided.
THE KENSINGTON
®
 
3-panel Door 
Installation
Sub-Frame
1)  Install the Sub-Frame by hooking the top 
fl ange onto the top of the Glass Door and 
swing the Sub-Frame towards the unit. Pull 
out the hooks which already secure the 
Glass Door and place them thru the holes 
in the bottom of the Sub-Frame to secure 
both the Glass Door and Sub-Frame in place 
together.
Glass Door
Sub-Frame
Hook
INSTALLATION