Regency P131-NG User Manual

Page of 40
Regency P121/P121LC/P121RC/P131 Zero Clearance Room Sealed Gas Fireplace
21
INSTALLATION
inside each other and can be adjusted for
2 x 4 or 2 x 6 walls. The liners must slip
over  the  collars  a  minimum  of  1-3/8".
5) Slip  the  assembled  liner  and  termination
assembly through the thimble making sure
the  termination  cap  faces  up  (there  are
markings on the cap that show which way
is up). This will position the termination cap
with proper down slope for draining water.
Fasten the cap to the outer wall with the 4
supplied  screws.
6) Pull the centre 4"(100mm) liner and outer
6-7/8"(175mm) liner out enough to slip over
the flue collars of the fireplace.  (You may
wish to cut the liner shorter to make it more
workable.) Do not bend liner more than 45
o
.
7) Apply Mill Pac over the fireplace inner collar
and slip the 4"(100mm) liner down over it
and  attach  with  3  supplied  screws.
8) Do the same with the 6-7/8"(175mm) liner.
9) Apply a bead of silicone between the thim-
ble and termination and around the outer
edge of the terminal at the wall in order to
keep the water out.
IMPORTANT: Do not locate termination
hood where excessive snow or ice build-
up may occur. Be sure to check flue termi-
nation area after snow falls, and clear to
prevent  accidental  blockage  of  flueing
system. When using snow blowers, make
sure  snow  is  not  directed  towards  flue
termination  area.
Note:  To  make  the
installation  more
aesthetically  pleas-
ing,  we  recom-
mend framing out a
square  to  mount
the  terminal  to.
be  used  to  ensure  that  the  termi-
nation  is  not  recessed  into  the
siding.
2) Level  the  fireplace  and  fasten  it  to  the
framing using nails or screws through the
nailing strips.
3) Assemble the flue assembly by applying Mill
Pac  to  the  4"(100mm)  inner  collar  of  the
termination and  slipping the 4"(100mm) liner
over it at least 1-3/8" (35mm). Fasten with
the 3 screws (drilling pilot holes will make
this easier). Apply Mill Pac or high temper-
ature silicone to the 6-7/8"(175mm) flex pipe
and slip it over the 6-7/8" outer collar of the
flue terminal at least 1-3/8"(35mm) and fas-
ten  with  the  3  screws.
NOTE: Horizontal  sections  must  be  sup-
ported  at  intervals  not  exceeding  3
feet (0.9 meter). (Flame picture and
performance  will  be  affected  by
sags  in  the  liner).
4) Separate the 2 halves of the wall thimble and
securely fasten the one with the tabs to the
outside wall making sure that the tabs are
on top and bottom. Fasten the other thimble
half to the inside wall. The thimble halves slip
roof  pitches,  the  vertical  height  must  be
increased.  A poor draft, or down drafting can
result  from  high  wind  conditions  near  big
trees or adjoining roof lines, in these cases,
increasing  the  flue  height  may  solve  the
problem.
7) Ensure flue is vertical and secure the base
of the flashing to the roof with roofing rails,
slide storm collar over the pipe section and
seal with a mastic.
8) Install the vertical termination cap by twist-
locking it.
Note: Any  closets  or  storage  spaces,
which  the  flue  passes  through
must  be  enclosed.
Offset Chart
INSTALLATION
PROCEDURES
for Regency AstroCap
TM
 Direct
Flue System (Flex)
1) Locate the unit in the framing, rough in the
gas. Locate the centerline of the termina-
tion  and  mark  wall  accordingly.  Cut  a
10"(254mm) hole in the wall (inside dimen-
sion).
Note: A  1-1/2"(38mm)  clearance  around
the  liner  must  be  maintained  ex-
cept  that  only  a  1"  (25mm)  clear-
ance  is  needed  at  the  termination
end.  We  recommend  framing  a
10"(254mm)  x  10"(254mm)  (inside
dimensions)  hole  to  give  struc-
tural  rigidity  for  mounting  the  ter-
mination.
Note: If installing termination on a siding
covered  wall,    furring  strips  must