DELL N20xx User Manual

Page of 462
Getting Started Guide
41
Unpacking the N30xx Switch
Package Contents
When unpacking each switch, make sure that the following items are 
included: 
One Dell Networking switch
One RJ-45 to DB-9 female cable
One ReadyRail kit for rack installation, two mounting brackets, bolts, and 
cage nuts
One set of self-adhesive rubber pads for the free-standing switch (four pads 
are included)
One  PSU 
Unpacking Steps
 
NOTE: 
Before unpacking the switch, inspect the container and immediately report 
any evidence of damage.
1
Place the container on a clean, flat surface and cut all straps securing the 
container.
2
Open the container or remove the container top.
3
Carefully remove the switch from the container and place it on a secure 
and clean surface.
4
Remove all packing material.
5
Inspect the product and accessories for damage.