Installation Procedures: Route and Attach Power Cables to the Racks
26
InfraStruXure System - Installation and Start-Up
– For single-feed devices within a 
redundant system with an Automatic 
Transfer Switch: connect a power cable 
to the Automatic Transfer Switch (A 
and B feeds) and connect the Automatic 
Transfer Switch power cord to a Rack 
PDU in the NetShelter VX Enclosure.
– For dual-feed devices in a redundant 
system with an Automatic Transfer 
Switch: connect a power cable from 
each PDU to the Automatic Transfer 
Switch’s A and B feeds, and another 
power cable from one PDU to a Rack 
PDU, and the Automatic Transfer 
Switch’s power cord to a second Rack 
PDU in the NetShelter VX Enclosure.
Note: Lay the cables neatly in the Shielding Trough to minimize cable buildup.
5. From each NetShelter VX Enclosure, run the power cable of the appropriate APC power 
management device out the roof of the enclosure, through the notch in the rear side of the Shielding 
Trough, to the connector of the appropriate power cable from the PDU. Plug the two connectors 
together, and twist them clockwise to lock.
Under Floor Wiring
Electrical Hazard:
 
A licensed electrician must route and connect the power cables for 
under-floor wiring.
Warning: Make sure all wire connections and circuit breaker connections are properly 
torqued.
To wire each power cable to an enclosure:
1. Push out a knock-out filler in the floor of the PDU to create an opening for the cable.
2. Install Liquidtite™ waterproof conduit under the floor from each enclosure to the PDU.
3. From the Rack PDU or Rack ATS in each enclosure, thread the appropriate power cable (for your