User ManualTable of ContentsAbout this Manual2Safety5IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS5Symbols used in this manual5Warnings6Installation/Maintenance6Maintenance performed while the PDU is receiving input power6Total Power Off7DANGER—Risk of Electric Shock!8Emergency Power Off (EPO)8EMI8Site Planning9Space Considerations9Installation Procedures11Installation Procedure Overview11Tools Required13Level the PDU, UPS, NetShelter, and XR Battery Enclosures14Exchange Side Panels15Exchange Side Panels15Connect Battery Enclosure communication cables16Join the PDU, UPS, and XR Battery Enclosures17Connect Utility Conductors to the PDU18Access the PDU Main Input switch18Attach conduit to the PDU for the input conductors18Install a circuit breaker19Route the input conductors to the Main Input switch20Connect input conductors20Connect AC Power and Control Wiring22Connect DC Power Wiring, if Applicable24Cascade XR Battery Enclosures24Connect power cables from the XR Battery Enclosure to the Symmetra PX UPS25Connect an Emergency Power Off Switch26Overview26Connect an EPO switch to the user connection plate27Connect User Input Contacts and Relay Outputs to the User Connection Plate28Overview28Route and Attach Power Cables to the Racks29Overhead Wiring29Under Floor Wiring30Route Data Cables to the InfraStruXure Manager Hub (or Switch)32Start-Up Procedure33Apply power to the system33Safety warnings33Verify UPS battery operation36Verify proper voltage and phase rotation at the UPS38Start the UPS38Verify bypass operation40Power the PDU Distribution Breakers42Configure the InfraStruXure Manager43Specifications4540 kW InfraStruXure PDU45Size: 2.33 MBPages: 48Language: EnglishOpen manual