Snapper 1733866 User Manual

Page of 14
5
Tube Component Assembly
Baffle Installation
1. Determine which baffle to use. See Figure  4 Chart.
2. Lift side discharge chute (H, Figure 4).
3. Insert baffle (F) through discharge opening and posi-
tion baffle into place.
4. Tighten carriage bolts (A) and nuts (E) on baffle (F).
5. Tighten carriage bolt (B) and nut (E) on baffle (F).
6. Position baffle (G) into place.
7. Tighten carriage bolts (C) and nuts (E) on baffle (G).
8. Tighten carriage bolts (D) and nuts (E) on baffle (G).
Figure 4.  Baffle Assembly
A. Carriage Bolts, 
5/16-18 x 5/8
B. Carriage Bolt, 
5/16-18 x 5/8
C. Carriage Bolts, 
5/16-18 x 5/8
D. Carriage Bolts, 
5/16-18 x 5/8
E. Locknut, 5/16-18
F. Right Hand Baffle
G. Left Hand Baffle
H. Discharge Chute
E
A
F
E
E
C
E
E
D
B
G
H
“A”
44” Mower Deck
50” Mower Deck
“A”
RH side 26-1/4” long
RH side 29-3/4” long
“B”
LH side 24-7/8” long
LH side 27-3/4” long
“B”