Xerox 120 User Manual

Page of 34
Xerox Nuvera™ 100/120 Digital Copier/Printer Customer Expectations Document 
- 8 -
 
Product Space & Power Requirements
 
Item 
Xerox Nuvera™ 100/120 Digital 
Copier/Printer 
Comments 
Size – Printer 
w/ 1 SFM & 
Professional 
MFF 
131.3”  (W) x 30” (D) x 61.6” (H) 
3336mm x 736mm x 1565.6mm  
 
Width – 
additional 
SFM 
31.7”  ( 805mm) 
 
Optional 
Service Space 
Fixed:  162” (W) x 113” (D) 
            ( 4114.8mm x 2870.0mm) 
Moveable: 162” (W) x 92” (D) 
                  ( 4114.8mm x 2336.8mm) 
- Fixed (stationary) installation: rear of the 
system should be at least 30” from the wall.  
- Moveable installation: rear of the system 
should be at least 10” from the wall and must 
be on mobility plates OR hard surface floor 
AND 4 modules or less. 
Weight 
1,753 lb. (795.1 kg) 
Additional SFM – 423 lbs. (191.9 kg) 
With consumables loaded (except media) 
Power and 
Agency 
Requirements 
North America 
208 Volts / 30 Amp sole use, 60 Hz 
Two phase, 3 wire + PE  (L1, L2, N, GND) 
 UL & cUL compliant 
 Complies with the FEMP (Federal Energy 
Management Program) via the machine 
circuit breaker (CB); with the CB switched 
off, the system consumes less than 1 watt. 
 Energy Star (eStar) compliant 
 Environmental Choice (Canada) 
 
Complies with Section 508 of the ADA 
Rehabilitation Act
 
Power 
Requirements 
Europe/Japan 
200-240 Volts / 25 Amp sole use, 50 Hz 
Single phase, 2 wire + PE (L, N, GND) 
 Energy Star (eStar) compliant 
 Units are compliant with applicable EU 
directives and are CE marked 
 
System Configuration and Installation 
Installation Preparation Document 
This section should be used in conjunction with the Xerox Nuvera™ 100/120 Digital Copier/Printer 
Installation Planning Guide (IPG) and the Xerox Nuvera™ 100/120 Digital Copier/Printer Installation 
Preparation Document (IPD), which contain detailed specifications for size, weight, electric, and 
environmental conditions.  Only the most important requirements are stated here. 
 
Customer Responsibilities 
The following must be completed before the system can be delivered and will be assessed in the final site 
check: 
Item 
Comments 
Identify placement of the system 
 
Ensure the printer can be delivered to the site 
 
Supply the appropriate electrical connections 
Dedicated power required  
Install an exhaust duct to vent hot air to the air 
system or the outside if required 
Heat Vent Kit is available for stationary system 
installations only.   The kit lowers the system’s output 
from approximately 17,500 BTU/hour to 8,500 BTU/hr. 
Verify the strength and slope of the floor