Quantum LTO-2 User Manual
![Quantum](https://files.manualsbrain.com/attachments/ca899287dff61d1f33a1c7bab7817a3b487b137c/common/fit/150/50/f93012c635c78a826a2112e2b27bef1217df419ecadb31ba968d3a8a7575/brand_logo.jpeg)
Chapter 2 Installation and Quick Start
Installing an Internal LTO-2 Half-Height Tape Drive
LTO-2 Half-Height Tape Drive User’s Guide
13
Connecting a SCSI
Cable
Cable
2
The internal LTO-2 Half-Height Tape Drive has an Ultra3 SCSI interface,
terminated by an LVD SCSI connector. Use the following procedure to
connect a SCSI cable to this connector.
1
Turn off all power to the drive and the computer.
2
Attach the SCSI interface cable to the 68-pin SCSI interface connector
on the back of the drive (see
Figure 5 Rear View of
the Internal LTO-2
Half-Height Tape Drive
the Internal LTO-2
Half-Height Tape Drive
Caution:
Install an LVD drive only in an LVD environment.
Plugging an LVD drive into an HVD bus makes the entire
bus non-functional and may permanently damage the
drive or other SCSI devices on the bus.
SCSI Jumper Block
Pin 1
Library Interface Connector
SCSI Connector
Power Connector