Lucent Technologies R5SI User Manual

Page of 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-67
ANL-LINE (8-Port Analog Line), ANL-NE-L (8-Port Neon Analog Line) 
10
40975
indicates that the terminal equipment was on-hook when 
ring-tip was detected during ringing. This usually indicates a failure 
in the terminal equipment or the type of terminal has a low ringer 
impedance. Call the terminal equipment and verify that the terminal 
rings. If the terminal doesn’t ring, then replace it. Otherwise, issue 
the 
test port PCSSpp
 command, and follow the procedure for Test 
#48.
40977
indicates that no terminal equipment was connected when 
ringing was attempted. Run the Short Test via the 
test port 
PCSSpp
 command, and follow the procedure for the results of Test 
#48.
b. This is a software audit error that does not indicate any hardware 
malfunction. Run Short Test Sequence and investigate errors (if any).
c. This error type indicates that the circuit pack has been removed or has 
been insane for more than 11 minutes. To clear the error, reinsert or 
replace the circuit pack.
d. Test #48 may cause some terminal equipment to ring briefly during daily 
maintenance. If this ringing is disturbing the customer or the terminal 
equipment, it should be disabled via the 
change station <extension>
 
command. However, on some releases of the software, this disables Tests 
#6, #47, and #35 as well as Test #48.
e. Test #47 may cause a false alarm when the port is connected to 
off-premises equipment, some non-voice terminal equipment, and some 
loop equipment. If this causes a false alarm, then disable the test by 
changing the Tests field of the 
change station
 command to "no."
f. Refer to "XXX-BD (Common Port Circuit Pack)" Maintenance 
documentation.
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when 
inspecting errors in the system. By clearing error codes associated with the 
Battery Feed Test
, for example, you may also clear errors generated from other 
tests in the testing sequence.
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Battery Feed Test (#35)
X
X
ND
Station Present Test (#48)
X
X
ND