Lucent Technologies R5SI User Manual

Page of 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-523
DIOD-TRK (DIOD Trunk) [G1.2SE] 
10
Loop Around and Conference Circuit Test (#33)
This test checks the reflective loop and conference abilities of a CO port circuit. 
The test uses 404 Hz, 1004 Hz, and 2804 Hz tones. Each tone is transmitted 
separately through the loop and checked.
1004
ABORT
The port was seized by a valid call during the test. The 
test has been aborted. Use the 
display port PCSSpp
 
command to determine the trunk group/member number 
of the port. Use the 
status trunk
 command to determine 
the service state of the port. If the service state indicates 
that the port is in use, then the port is unavailable for 
certain tests. (Refer to the "Status Commands" section in 
Chapter 10, "Maintenance Commands and 
Trouble-Clearing Aids" for a full description of all 
possible states.) You must wait until the port is idle 
before retesting.
2000
ABORT
Response to the test request was not received within the 
allowable time period.
2100
ABORT
Could not allocate the necessary system resources to 
run this test.
1. Retry the command at one-minute intervals a 
maximum of five times.
2. If the test continues to abort, escalate the problem.
Any
FAIL
The NPE of the tested port was found to be transmitting 
in error. This causes noisy and unreliable connections.
1. Replace the circuit pack.
PASS
The port is correctly using its allocated time slots. 
User-reported troubles on this port should be 
investigated by using other port tests and by examining 
trunk or external wiring.
Table 10-141.
TEST #6 NPE Crosstalk Test  — 
Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page