Lucent Technologies R5SI User Manual

Page of 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-937
MMI-BD 
10
Control Channel Looparound Test (#52)
Refer to the repair procedure described in the XXX-BD (Common Port Circuit 
Pack) maintenance documentation as Control Channel Looparound Test (#52). 
SAKI Sanity Test (#53)
Refer to the repair procedure described in the XXX-BD (Common Port Circuit 
Pack) maintenance documentation as SAKI Sanity Test (#53).
FAIL
The MMI circuit pack is out of MMI synchronization. Run the 
long
 option of the 
test board
 command. 
1. Wait up to 5 minutes, and then reset the circuit pack with these 
commands: 
busyout board PCSS
, then
 reset board PCSS
, followed by
 
release board PCSS
.
2. Rerun the test; if the same result occurs again, replace the circuit pack.
1100
PASS
The MMI circuit pack is providing the synchronization correctly. This MMI 
circuit pack is designated as the Master Sync source.
1101
PASS
The MMI circuit pack is listening to the synchronization signal correctly.
Table 10-268.
TEST #1122/1123 MMI Synchronization 
Status Test — Continued
Error 
Code
Test 
Result
Description/Recommendation
Continued on next page