Lucent Technologies R5SI User Manual

Page of 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-13
AC-POWER 
10
The environment maintenance strategy to be used depends on both the cabinet 
configuration and the type of powering. Refer to the "DC-POWER (Single-Carrier 
Cabinet Power)" information for environment maintenance strategy.
In a DC-powered multicarrier cabinet system, the AC-POWER maintenance 
object still exists, but serves no functional purpose. Because the system cannot 
determine the type of powering provided, all AC-POWER tests should always 
either pass or abort.
Error Log Entries and Test to Clear Values 
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the order presented in the following table. By clearing 
error codes associated with the 
AC Power Query Test
, for example, you may also 
clear errors generated from other tests in the testing sequence.
1.
Run the Short Test Sequence first. If all tests pass, run the Long Test Sequence. Refer to the 
appropriate test description and follow the recommended procedures.
Table 10-5.
AC Power Error Log Entries
Error 
Type
Aux 
Data
Associated Test
Alarm 
Level
On/Off 
Board
Test to Clear Value
0
1
0
Any
Any
Any
test environment P sh r 1
513
Any
AC Power Query Test 
(#78)
WARNING
OFF
test environment P sh r 1
Table 10-6.
System Technician-Demanded Tests: AC-Power
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Battery & Battery Charger Query Test (#5) (a)
X
X
ND
AC Power Query Test (#78)
X
X
ND
Power Unit Query Test (carrier E) (#127) (b)
X
X
ND
Power Unit Query Test (carrier D) (#127) (b)
X
X
ND
Power Unit Query Test (carrier A) (#127) (b)
X
X
ND
Power Unit Query Test (carrier B) (#127) (b)
X
X
ND
Continued on next page