Lucent Technologies R5SI User Manual

Page of 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-14
AC-POWER 
10
Notes:
a. Refer to "POWER" for a description of this test.
b. Refer to "CARR-POW" for a description of this test.
c. Refer to "EMG-XFER” for a description of this test.
d. Refer to "CABINET" for a description of this test.
e. Refer to "EXT-DEV ADMIN? N” or "EXT-DEV ADMIN? Y" for a description of 
this test.
f. Refer to "RING-GEN" for a description of this test.
AC Power Query Test (#78)
This test queries the Maintenance/Tape Processor in a PPN in a system without 
High or Critical Reliability, the Duplication Interface circuit pack in a High or 
Critical Reliability system PPN, or the EPN Maintenance circuit pack in an EPN 
multicarrier cabinet system for the status of AC power to the switch. In a 
DC-powered system, this test should never fail.
1.
D = Destructive, ND = Non-destructive
Power Unit Query Test (carrier C) (#127) (b)
X
X
ND
Emergency Transfer Query Test (#124) (c)
X
X
ND
Cabinet Temperature Query Test (#122) (d)
X
X
ND
External Alarm Lead Query Test (#120) (e)
X
X
ND
Analog Ring Generator Initialization Test (#117) (f)
X
X
ND
Analog Ring Generator Query Test (#118) (f)
X
X
ND
Table 10-6.
System Technician-Demanded Tests: AC-Power — 
Continued
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Continued on next page