AMCC 9590SE-4ME User Manual

Page of 93
BBU Object Commands
www.3ware.com 
77
/c
x
/bbu show serial
This command 
shows
 the BBU serial number. 
/c
x
/bbu show fw
This command 
shows
 the BBU firmware version number. 
/c
x
/bbu show pcb
This command 
shows
 the PCB revision number on the BBU. 
/c
x
/bbu show bootloader
This command 
shows
 the BBU's boot loader version.
/c
x
/bbu show all
This command shows the current settings of all BBU-related attributes: ready, 
status, batinst, lasttest, volt, temp, cap, serial, fw, pcb, bootloader. 
Example:
 //localhost> /c1/bbu show all
/c1/bbu Firmware Version          = BBU: 1.04.00.007
 /c1/bbu Serial Number             = Engineering Sample.
 /c1/bbu BBU Ready                 = Yes
 /c1/bbu BBU Status                = OK
 /c1/bbu Battery Voltage           = OK
 /c1/bbu Battery Temperature       = OK
 /c1/bbu Estimated Backup Capacity = 241 Hours
 /c1/bbu Last Capacity Test        = 22-Jun-2004
 /c1/bbu Battery Installation Date = 20-Jun-2004
 /c1/bbu Bootloader Version        = BBU 0.02.00.002
 /c1/bbu PCB Revision              = 65
//localhost>
/c
x
/bbu test [quiet]
This command starts the battery capacity test. The test may take up to 24 
hours to complete. During the test, the BBU is not capable of backup 
operation and the write cache of all units attached to that controller is 
disabled. Once the test is completed with no error and the BBU status returns 
to OK, the write cache will be re-enabled.